What are the steps of the decoration process and what is the order

Decoration is a big project, which involves a lot of things, and the process steps are also very complicated. Want to know what are the steps of the decoration process, what is the order, follow the editor to take a look.

The main process of decoration is roughly divided into design, main body dismantling, water and electricity, carpentry, painter, socket board installation, kitchen and bathroom, ceiling, doors and windows, hardware, floor, and finally the purchase of soft furniture and staying.

1. If you design, you can design according to your actual needs, or you can find a designer online. Generally, there are many free designs online. You can try a few more. If you design your own, try to make good records. What are the hard needs, living habits, and storage requirements? It is important to take notes.

2. Mainly include demolition of walls, masonry walls, shoveling of wall skins, dismantling of heating, replacement of plastic steel windows, etc. There is a lot of construction waste, which needs to be cleaned up in time.

3. The hydropower transformation must be cautious. If you are not satisfied with the result, it is more difficult to reform it. So think about the exact location of each appliance and socket.

Before the electrician enters the site (about 3 to 5 days), you can order kitchen cabinets, gas stoves, range hoods and other stoves. After the opening of the wire and groove by the hydroelectrician, you can start ordering wall tiles and floor tiles.

4. The bathroom should be waterproof before paving the floor tiles, before installing the tiles, you must buy a floor drain, a special washing machine or shower floor drain, and anti-odor function.

5. Large core board sink bottom → veneer veneer → paint this step. In the case of paint, leveling → polishing → rolling brush, the effect is good or not, absolutely rely on the craftsmanship of your oiler.

6. It is also necessary to pay attention to the installation of sockets and electric boards. In some places, single-pole double-throw switches need to be installed.

7. Install the water heater and the bathroom heater on the kitchen and ceiling. After installation, the edge sealing of the ceiling can better half pack the water heater, which is more beautifully connected.

8. Not much to say about installing cabinets, mainly to install finished doors. Finished doors should be installed before the floor, mainly because of the complicated door installation steps, hinges, door locks, door suction, door frames, etc., there are many tools used, it is worth noting It is necessary to install the floor first to avoid unnecessary damage to the floor during the door installation process.

9. Be sure to level the floor before sticking it on the floor. You can prepare some pepper grains in advance. Don't buy the so-called insecticide powder brought by the floor workers. Let them sprinkle along the kick corner.

10. After the entire hard outfit is installed, you can prepare the furniture for admission. The choice of furniture should match the decoration style as much as possible, and also consider the space and practicality of the home.