Don't rush to check the package and stay in the hardcover room

In this website's publicity advertisement, Huang Xiaoming said that "hate a person and let him go to the decoration." Decoration is really a very troublesome thing. Most of the owners buy rough rooms, and of course, some economic conditions are also good choice hardcover room. Hardcover rooms save a lot of time compared to rough rooms, which can be described as "accommodation." However, acceptance is still essential. The hardcover room is not like the rough room, because the decoration has been completed, so the acceptance should be more detailed. Here are some suggestions for everyone, hoping to help you.

1. Preparation

Inspection of the house is a hard and complicated project. The preparatory work before the start must be in place so that the room can be checked. The purchase contract must be available, and there are many attachments on the contract that are important for the acceptance of the furnishing room, such as the community map and the detailed rules.

Drawings with dimensions of the room type should be prepared before acceptance of the house, not only the layout of the house, but also the drawings of the circuit and the waterway. Before the acceptance of the house, we must take the key, and the number of keys is relatively large. There are floor keys, door keys, water meters, and meter keys. Be careful not to miss it. The decoration material confirmation sheet is also indispensable for acceptance. The above records the brand, style and model of the material, and it is necessary to check the acceptance of the fully furnished room.

2, acceptance structure

It was found that the structure of the fully-decorated room was inconsistent with the contract and must be submitted to the real estate developer prior to arrival. If the resistance was encountered, it could also be reported to the relevant government departments. If only the non-structural problems were found, the house could be hand-written when it was handed over to require real estate records. The company has written a commitment to perform maintenance within a certain time limit. The first step is to inspect the whole house after renovation, check the area, check the orientation of the location, measure the public area, and check whether some outdoor facilities are intact.

Checking the project is often overlooked by many owners and it is considered unlikely that there will be problems. In fact, many owners have been surprised to find that the construction project has been omitted.

The home inspection should pay attention to whether the materials used are consistent with those promised in the contract, whether it is a well-known brand, whether the model styles correspond to each other, etc. Any mistakes should be negotiated in a timely manner. After a small high-rise renovation, such a problem sometimes arises. The floor height is inconsistent with the promise of the developer. The high-rise building that has high tension before the renovation is more likely to become depressed after renovation. Whether or not the balcony can be closed is a common concern for the owner after he has collected the house. The owner of the house must also consider that if the balcony is to be closed in the future, some layouts may need to be changed. Whether the bathroom exhaust hole has been left well is a link that should not be neglected in the acceptance. The ceiling can be opened to check whether the pipeline is installed in place. Some vacant structures must not be neglected. Special attention should be paid to the size and what can be used in the future. For example, the empty space in the kitchen is not enough to place the refrigerator. It is very embarrassing.

New house acceptance notice decoration experience

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Floor Smart Toilet

High-tech features: The floor mounted Smart Toilet is equipped with a wide range of advanced features that enhance the overall user experience, including self-cleaning function, automatic flushing, seat heating, adjustable water temperature and pressure, bidet function, night light and more.

Easy to install: Designed for easy installation, the floor-mounted smart toilet fits in most bathrooms without additional plumbing or structural modifications. This makes them an easy choice for new construction and bathroom renovations.

Easy to clean: The floor smart toilets often feature self-cleaning features and stain-resistant ceramic coatings. The self-cleaning feature uses water and detergent to keep the toilet clean and hygienic, reducing the need for manual cleaning. Plus, the stain-resistant ceramic coating helps prevent dirt and stain buildup, making it easier to keep your toilet clean.

In summary, the floor standing intelligent toilet provides a luxurious and convenient bathroom experience. With advanced features, easy installation, low maintenance requirements and improved hygiene, it is the ideal addition to modern bathrooms where functionality and comfort are sought.

Floor Smart Toilet, Smart Water Closet, Smart Bidet Toilet, Auto Flushing Toilet

Guangdong Fabia Intelligent Technology Co., Ltd , https://www.fabiaintelligent.com

Posted on