Decoration project contract
Contract No.: Yuyao **-**• North Block B+C, Yuyao Gold Type II Road - Phase I - Construction No. 002
Date of signing: August 17, 2010
Signed Location: No. 996, Xiaoshao Road, Xiaoshan District, Hangzhou City, Zhejiang Province, China
Party A:
Place of residence:
Place of business:
Legal representative:
Attorney:
phone:
fax:
email:
Account Bank:
Bank Account:
Tax Registration Number:
Postal code:
Party B:
Place of residence:
Place of business:
Legal representative:
Attorney:
phone:
fax:
email:
Account Bank:
Bank Account:
Tax Registration Number:
Postal code:
According to the relevant laws and regulations of the state, in order to clarify the rights, obligations and responsibilities of both parties and safeguard the rights and interests of both parties, the design, supply, shipment, construction and installation of interior decoration drawings of the Yuyao Shanshui Yishu Comprehensive Building Project shall be carried out through friendly negotiation between the parties. , maintenance and other matters entered into this contract. Both parties promised to fully implement all the terms of the contract.
Article 1 Project Overview 1. Project name: (hereinafter referred to as the project).
Second, the project location: Zhejiang Province **.
Third, the number of projects: comprehensive interior decoration projects (see Annex construction of a club building drawings).
The second project scope I. Engineering design
1. Within three days from the signing date of the contract, Party A shall provide Party B with the “Construction Drawings for Comprehensive Buildings†(this map shall meet the requirements for the application for review), and Party B shall issue a receipt in a signed manner.
2. Within 20 days after Party B receives the “Building Map of Comprehensive Buildingâ€: Party B completes and submits the “Interior Decoration Drawing†to Party A on the basis of “Building Map of Comprehensive Building†and “Interior Decoration Effect Diagramâ€. It is necessary to sign and issue a receipt. If Party A disagrees with the "Interior Decoration Construction Drawing", it shall submit a written request to Party B within 3 days after the receipt. If there is no objection, Party A shall sign and confirm the "Interior Decoration Construction Drawing."
3. This "Interior Decoration Construction Drawing" is supplemented as Annex 2 of this contract. Party B will perform the construction according to this drawing.
4. Party B provides the “quotas configuration list†according to “Interior Decoration Construction Drawing†confirmed by Party A, and is added as Annex 4 of this contract.
2. Project management includes, but is not limited to, the construction and management of interior decoration design, material shipment, interior decoration construction, and installation of the project (including maintenance after completion of the project).
Third, materials and equipment procurement
1. The materials required in the scope of the project shall be purchased and provided by Party B in addition to those specified in the “Material Equipment Configuration Table†attached to this contract. The main materials purchased by Party B shall be sealed in accordance with Party A's written request. Sample sealing method: According to the order of materials in “Material Equipment Configuration Tableâ€, Party B shall cut the sample and fix it on a five-ply plate with a width of about 600×length and 1 000 mm, and submit it to Party A for preservation. Party A may seal the sample. Take pictures and keep them for future reference.
2. Party B must strictly follow the “Material Equipment Configuration Table†confirmed by Party A’s signature (see Attachment 3 of the contract for details) and Party A’s seal samples for procurement. Material model photographs (closed sample sheets) shall be confirmed by both Party B and Party B in writing. Become an attachment to this contract. Due to market reasons, a certain material or equipment cannot be purchased on time. Party B shall promptly notify Party A in writing. Party A shall send Party B a “Material Adjustment Notice†within two days after receiving Party B's written notification. Party B must rely on this material. The "adjustment notice" will replace or replace the material with other materials of the same grade; if Party A fails to provide a written reply within 7 days, Party A may agree that Party A agrees to the contents of written notice.
3. The raw materials, semi-finished products, etc. entered by Party B must also provide the list of raw materials, the original certificate of material products, and the original quality assurance certificate. If you have imported materials or equipment, you must provide the originals of the customs, commodity inspection documents, and certificate of origin. After Party A's acceptance, you can proceed with the construction. Otherwise, Party A can suspend the payment and will not be liable for the breach of the overdue payment, Party B’s The duration of the project will not be postponed.
4. Installation and Construction (1) Party B's construction scope includes the interior decoration, equipment and installation of the project. The construction details are shown on the construction drawings confirmed by Party A (see Attachment I to the contract for details). List of Quotation Configurations (See Attachment 4 to the Contract for details) Prevail, drawings and drawings are sorted by drawings.
(2) After Party B's main structure is completed and Party B meets the following entry conditions, Party B will enter the site for construction:
1 The main structure of the project has passed the acceptance of the Party A structure and meets the relevant construction project quality acceptance standards;
2 Party A provides on-site temporary facilities, and related facilities and other expenses are borne by Party B.
3 doors and windows installed, with the conditions for starting the interior decoration.
4 The fireproofing of the steel structure is completed.
5 The joints between the steel structure and the wood structure are processed.
If there is no entry condition, Party B may not sign the "Starting Report".
(3) Party B is responsible for the laying of interior decoration pipelines. (Excluding sewage system pipelines)
Article 3 Contract Documents In this contract, the following documents constitute the inseparable part of this contract:
First, the second floor of the contract, comprehensive building plans, interior decoration renderings (Annex 1)
Third, the interior decoration construction drawings (Annex 2)
Fourth, "Material Equipment Configuration Table" and some material photos (Annex 3)
V. "List of Quotation Configurations" (Annex 4)
Six, "Housing Construction Project Quality Warranty" (Annex 5)
7. The project modification shall be implemented in accordance with Party A's "Measures on Design Changes and On-site Visas" (Annex 6).
VIII. The ICAC Convention (Annex VII)
Article 4 Contract Duration I. Commencement Date: August 10, 2010, Completion Date: It is estimated that December 9, 2010, the total number of calendar days of the contract [122] days. The specific start time is based on the “Starting Report†signed by Party A, the Supervisor, and Party B. The completion time is based on the contents of the contract and Party B completes the project, subject to acceptance conditions.
Second, the specific duration of the agreement is as follows: The construction period of the first floor lobby and the first floor of the men's and women's toilet area is 58 days; part of the construction period of the rest of the area is 122 days.
3. Party A shall notify Party B in writing 15 days in advance to receive the site. Party B shall receive the construction site on the stipulated date of the written notice and shall immediately carry out the construction and installation of this contractual project.
4. If one of the following circumstances of this project is confirmed by Party A's signature, the duration shall be extended accordingly:
1. Party A cannot provide the construction site on time. The water, electricity and roads cannot be connected, and obstacles cannot be cleared, which affects Party B's approach to construction;
2. Party A failed to complete the structure construction of the clubhouse on time, or the structure of the clubhouse provided by Party A did not have the conditions for interior decoration;
3. Party A fails to pay the progress of the project according to the stipulations in the contract, which will affect the construction or installation of Party B;
4. After the design plan and the bill of materials have been signed by Party A, it is also due to Party A's request for design changes, which will affect the progress of the project;
5. In the construction, if the non-Party B factors do not meet the national requirements for construction conditions and need to adjust the construction period, the two parties can extend the agreement after entering into a supplementary contract.
6. Party A did not confirm Party B’s reasons and signed Party A’s contract, which affected the construction of the next procedure.
7. Man-made irresistible factors delay the construction period, but Party B should promptly notify Party A;
Due to the above reasons, the project will be delayed. Party B must submit a written notice of the extension of the project deadline to Party A within 3 days after the related situation occurs. The duration of the project can be postponed after Party A's signature is confirmed. If Party A has any objection, it shall be in the signature file. Clearly and specifically stated; if Party B fails to submit a written notice on time, it will lose the right to extend the time limit; if Party A fails to confirm it on time, or does not expressly object, it shall be deemed to have admitted or defaulted Party B's written notice.
Article 5 Quality of the Project 1. Party B shall ensure that the quality of the project meets the current national acceptance standards for construction, installation engineering and wood structure acceptance, construction operating procedures and quality acceptance standards, and guarantees one-time acceptance.
Acceptance criteria are:
1. "Code for Acceptance of Quality of Intelligent Building Engineering" GB50339-2003
2. Specification for Acceptance of Construction Electrical Engineering Quality GB50303-2002
3. "Code for Acceptance of Construction Quality of Ventilation and Air Conditioning" GB50243-2002
4. Specification for Construction Quality Acceptance of Building Water Supply, Drainage, and Heating Engineering GB50242-2002
6. Specification for Construction Quality Acceptance of Building Surface Engineering GB50209-2002
5. Specification for Construction Quality Acceptance of Building Decoration Engineering GB502100-2001
7. Specification for Acceptance of Construction Quality of Wood Structure Engineering GB50206-2002
8. "Unified Standard for Quality Acceptance of Construction Engineering" GB50300-2001
9, interior decoration construction drawings, related renderings and photos
10, "Material equipment configuration table" and some of the main material sealing photos.
2. Party B shall be fully responsible for all site operations, construction methods and the completeness, safety, and project quality of the completed project. Acceptance of concealed projects must be confirmed by Party A and the supervisor in writing before proceeding with the next process.
Article 6 Performance Guarantee 1. The guarantee method of this contract is the performance guarantee. Party B shall issue a performance bond in accordance with the amount of 10% of the contract price (tentative pricing) and submit it to Party A within 15 days after the date of the contract. If Party B fails to submit the performance guarantee on time, Party A may directly deduct the amount equal to the amount of unpaid project due.
2. The amount of the above-mentioned performance letter includes the project quality performance bond [40]%, period performance bond [40]%, safe and civilized construction performance bond [10]%, managerial personnel and mechanical equipment in place performance bond [10]%. If Party B has a breach of contract, Party A may deduct from the amount guaranteed by the performance bond, the breach of contract shall bear the breach of contract damages from Party B.
III. Within 30 days after completion and acceptance of this contracted project has been completed and the engineering and engineering technical data have been delivered to Party A according to regulations, the performance guarantee shall be released.
Article 7 Contract Settlement A. This project adopts a fixed integrated unit price contract form (consolidation unit price per square meter of building area), including contractors, materials, machinery and equipment, quality of packages, safe production, and large-scale contracting methods for civilized construction. The total construction area of ​​the contract works is tentatively set at 2,403 square meters.
2. After the completion of acceptance of all contractual projects, the construction area of ​​all the projects in the contract shall be settled according to the as-built drawings confirmed by both parties' signatures in writing. According to the "Code for the Calculation of Construction Area of ​​Construction Projects" (GB/T50353-2005), settlement shall be made on a real basis. .
3. The contract amount includes the price for the scope of work specified in Article 2 of this contract, that is, the total contract price = fixed integrated unit price × settlement floor area. If Party A asks for replacement of different products or changes the contents of the construction project, it shall be submitted by Party B according to the on-site written visas of both parties, in accordance with the artificial, mechanical, and unit rates approved by Party A and the corresponding accounting rates, in accordance with the bid prices. The consumption of the "Zhejiang Construction Project Budget Quota" (2003 version) is reconstructed into a fixed comprehensive unit price, which is confirmed by Party A's examination and entered into settlement.
4. The fixed integrated unit price for the indoor part of the project (including central air conditioning equipment, fresh air system, etc.) is ¥3 500_yuan/square meter, and the tentative total price of this contract is ¥_8 410 500 yuan. Yuan Zheng). The price of this contract includes the design, supply, shipment, construction, installation, pre-buried and maintenance of kitchen equipment and water and electricity pipelines. Without the prior written consent of Party A, the fixed consolidated unit price of this contract project will not be adjusted.
Article 8 Payment Means I. First payment: Within 15 days after the signing of the contract, Party A shall use 30% of the provisional total price in accordance with paragraph 4 of Article 7 as the project advance payment.
Second, the second payment: Party B completes the concealment project and within 20 days after the acceptance by Party A, Party A shall pay Party B the 30% of the tentative total amount of the contract.
Third, the third payment: After Party B completes the interior decoration project and equipment installation, and within 20 days after acceptance by Party A, Party A shall pay Party B the 30% of the tentative total amount of the contract.
Fourth, the fourth payment: The project under this contract is completed and accepted, and is handed over to Party A. At the same time, the original engineering technical data is submitted to Party A according to the contract. The project settlement document is signed by Party A and Party B. Within 20 days after the confirmation of the chapter, Party A pays Party B to 97% of the settlement price.
V. The fifth payment: Within 20 workdays after the full implementation of the “House Construction Quality Warranty Agreement†in the appendix, payment shall be made to 100% of the settlement price. The specific payment methods are detailed in Annex 5.
6. Before each payment, Party B shall deliver to Party A the legal and valid tax invoice of the corresponding amount. Otherwise, Party A may refuse to pay, and shall not be liable for the breach of the overdue payment. Party B's construction period shall not be postponed.
Article 9 Rights and Obligations of Party A 1. Party A shall appoint **** as the representative of Party A's management personnel, exercise Party A's rights as stipulated in the contract, and fulfill Party A's obligations.
2. The construction organization design approved by Party A in written form and Party A's written instructions and requirements shall be organized and implemented by the Party B project manager.
Third, the designation of the on-site identification of the site shall be entirely based on Party A's logo, and Party B shall actively cooperate with it.
4. Only the power and water sources within 50 meters from the construction site of Party B are required for the construction of the project. The construction water, electricity and communication lines required for the project and related costs shall be provided by Party B. Meanwhile, the Items shall be measured separately by Party B and the expenses shall be borne. If the meter is damaged and the meter cannot be metered, then Party B's water and electricity expenses shall be measured in accordance with the quota standard specified in this contract, and the unit price shall be calculated according to the market price during the same period.
Fifth, responsible for providing the main structure of the building plans, structural drawings, water supply and drainage, electrical construction drawings.
VI. Responsible for providing temporary facilities for the construction of the project, site construction materials and other places, A and B parties to negotiate settlement to ensure that the construction site has the construction conditions. The temporary construction facilities and construction material dumping sites required during construction shall be erected by Party B after obtaining the consent of Party A or its authorized organization (or personnel), whether within or outside the construction site. .
7. Payment shall be made in time according to the payment conditions stipulated in the contract.
8. To ensure the accuracy of the information and information provided in the scope of the project, Party A shall guarantee that the construction road and site will not affect the normal construction of Party B.
IX. Responsible for ensuring that the on-site construction period of Party B is not restricted.
10. Responsible for obtaining the administrative approval documents and approval procedures required for the commencement of the project, handling all government-related procedures in the project construction process, and being responsible for the completion data of the project's main structure; if it is necessary to submit relevant information to the government department, Can ask Party B for assistance.
11. To handle all the formalities for the application for review and approval of the construction drawings of this contract, Party B shall cooperate with Party A to handle the matter. The total package management cooperation fee and other corresponding expenses shall be borne by Party A.
XII. Responsible for submitting the inspection formalities to the relevant government departments after completion of the contract project, and Party B shall provide the original file information in a timely manner.
Article 10 Rights and Obligations of Party B 1. Party B shall appoint *** as the project manager of Party B, represent the rights of Party B agreed upon in the contract, perform the responsibilities of Party B as stipulated in the contract, and any instructions given to the project manager of Party B shall be deemed to be effectively conveyed to Party B.
2. If Party B submits a written report to Party A on the important work in the development and construction of the project, and Party A fails to provide a written reply within 5 working days, Party B may consider Party A's consent to the proposal in Party B's written report and do so accordingly. Decision.
3. In case of emergency and failure to contact Party A's management personnel, Party B may take emergency measures to ensure the safety of the project and personnel's life and property, and send a written report to the management of Party A within 24 hours after taking the measure. .
4. After the completion of each subproject of the project, Party B shall apply to Party A for inspection in written form. After acceptance, Party B shall perform the next procedure; if Party A does not organize acceptance within 7 working days after receiving the application, or If Party A does not re-inspect the application for written objection to the application for inspection documents, it shall be deemed that the project of the division is qualified by default, and Party B may perform the next procedure.
V. To confirm the construction conditions provided by Party A, if it is found to be inconsistent with the conditions stipulated in the contract documents, it shall promptly report to Party A in writing to ensure that the project will proceed as scheduled.
6. Take full responsibility for the relevant construction methods, construction techniques and construction safety of this project. The responsibility for construction failure shall not be shirked to Party A for any technical or non-technical reasons (except for Party A); at the same time, Party B shall bear all costs incurred due to rework due to Party B's construction mistakes.
VII. Strengthen the construction site management and take safety precautions. If any personal injury or other accident occurs during construction due to its own management, Party B shall be responsible for handling and taking responsibility.
VIII. All Party A's management systems must be followed. Construction activities shall be carried out within the prescribed scope. Party B shall be responsible for any losses, damages, or claims caused by Party B's improper construction to Party A or any third party.
IX. Before the contract works have been handed over to Party A in writing, Party B shall be responsible for the protection of all its own products and finished products at the construction site.
X. The project manager of Party B shall inform Party A of the progress of the project on a weekly basis in the form of a project brief. The opinions formed shall be signed and confirmed by Party A's management personnel and Party B's project manager.
11. After all the projects are completed, Party B shall notify Party A in writing of acceptance and be responsible for providing Party A with relevant archives. All inspection procedures shall be handled by Party A.
XII. Party B shall be responsible for Party B's on-site management personnel and workers' accommodations and wages, subsidies and other related expenses.
XIII. Safe Production, Civilized Construction Requirements:
1. Implement the principle of "who works and who is responsible for" safe production.
2, must obey the safety management regulations of Party A's construction site, accept Party A's safety inspection, supervision and punishment.
3. It is imperative to seriously implement the regulations concerning civilized construction of the local government, cooperate with Party A in civilized construction on the construction site, and accept Party A's management.
4. One year or so after the acceptance of the project, complete a repair work on the interior decoration surface.
14. Project members who need to designate this project include project managers and other managers and technicians. The list of aforementioned persons shall be provided to Party A in written form within 7 days before the official commencement of work.
15. In principle, the project members cannot be changed; but if there are special circumstances that need to be changed, Party A should notify Party A 7 days in advance of the change and agree with Party A's written approval. The successor continues to assume the responsibilities of his predecessors.
Article 11 Project Completion and Project Warranty 1. The project acceptance conditions are as follows: Party B shall complete all the construction contents within the scope of the construction drawing, the “Quotation Configuration Listâ€, etc., and the appearance effect shall conform to the interior decoration effect diagram of Annex 1. The work of each division has been completed according to the design requirements. The technical indicators meet the national regulatory requirements; technical documents, engineering and technical files, test and completion data are complete, and maintenance tools, instruments, and maintenance spare parts are complete. At the same time, Party B shall deliver to Party A the acceptance report in accordance with regulations and attach all relevant engineering and technical data. Party A shall accept and accept the project within 15 working days. If the project is accepted, the two parties shall sign the "Project Acceptance Checklist". The project that has not signed the "Project Acceptance Checklist" shall be regarded as a non-conforming project. Party B shall complete all the rectification within 20 working days from the acceptance date. And re-acceptance according to the agreement, the duration will not be postponed.
2. If the project is qualified for acceptance, Party B shall, within 15 working days from the acceptance date, hand over the original project completion data to Party A. The completion data of the project will be stamped with the “Completion Data†stamp and will be officially completed.
3. For any damage caused by the materials provided by Party B or the quality of the construction or installation of the project, Party B must, after the completion of acceptance, provide warranty, repair, or replacement free of charge within the period specified by the relevant state laws. Please refer to the attachment for details. As the main structure of the deformation, cracking and other non-B Party responsible for damage caused by the decoration, Party B is not responsible for maintenance.
Article 12 Project Modifications and Settlement 1. The contract may not be changed or modified without prior written consent of both parties.
Second, due to design changes or Party A reasons for the increase or decrease in the amount of work or materials, both parties agree to deal with the following agreement:
1. Items that are the same as or similar to those in the “Quotation Configuration List†in Annex 4 of the contract, are priced according to the list items and settled on a real basis;
2. Items that are not the same as or not similar to the “quota configuration list†in the Annex 4 of the contract are submitted by Party B according to the manual, machinery, and the unit price of materials approved by Party A and the corresponding accrued rates according to the bid price. The consumption of the provincial construction project budget quota shall be reconstituted into a comprehensive unit price, which shall be verified by Party A to enter settlement.
III. After completion acceptance of the project, Party B will provide Party A with valid and complete settlement information in accordance with relevant regulations and contract (including but not limited to this contract, supplementary agreement, calculation draft, statement of account, various contact lists, completion acceptance And so on), Party A shall complete settlement audit within 3 months from the date of receipt of Party B's aforementioned settlement information.
4. This contract project has been submitted to any file of the urban construction archives department of the project site, and is only used for record purposes. Both parties shall not use this as the basis for the actual settlement of this contract.
Article 13 Liabilities for breach of contract 1. If Party B cannot complete the project within the time limit agreed in the second paragraph of Article 4 of this contract, Party B must bear Party B's overdue breach of contract payment. For each of the overdue days, within 30 days, Party B shall accumulatively pay liquidated damages in accordance with 0.5‰ of the tentative total price of the contract; if it exceeds 30 days, the overdue period will be 1 day, and Party B shall accumulate 1 in accordance with the provisional total price of the contract. Pay a penalty fee. Party B’s breach of contract can be deducted directly from its project payment.
2. If the construction and installation quality of Party B fails to meet the acceptance criteria specified in the contract or in the first paragraph of Article 5 of this contract, Party B shall be responsible for free rework and repair, and the construction period shall not be postponed. If the quality of the project has not been rectified, the contract can still not reach the contract. Under the agreement, Party B shall pay Party B a penalty of 10% of the tentative total price of the contract.
Third, in addition to professional equipment, security, cabinets, stone, doors, windows, decorative wood accessories and other conventional subcontracted items, without prior written consent of Party A, Party B shall not subcontract this contract project, subcontracting. Otherwise, Party A may notify Party B to terminate the contract and refuse to pay the project price for the subcontracting and subcontracting of part of the project by Party B. At the same time, Party B shall also bear Party B’s 20% of the tentative total price of the contract to bear the loss compensation amount to Party A. If Party B terminates the contract due to Party B's subcontracting or dismembering and subcontracting this contractual project, Party B’s construction materials, construction equipment and facilities shall all be evacuated from the construction site within 10 days from the date of receipt of Party A’s notice of cancellation of the contract. . Otherwise, Party A can be treated as free from any subject.
4. If Party A fails to pay the project payment or settlement money on time, it shall be liable to Party B to bear the overdue payment default penalty at the rate of 0.05% of the unpaid due amount.
5. This contract is a major trade secret between the two parties. The parties ensure that this contract will not be disclosed to any third party. If any of them causes losses to one of them, the leakage will be borne by the other party at 10% of the tentative total price of the contract. Liquidated damages.
Article XIV Force Majeure Factors During the performance of this contract, due to earthquakes, typhoons, floods, snowstorms, wars, strikes by workers in importing countries and other force majeure events that were unforeseen and their results could not be prevented or avoided, they directly affected the performance of this contract. If it fails to perform according to the agreed conditions, the party in case of force majeure shall notify the other party promptly after the occurrence of force majeure, and notify the other party of the circumstances and causes of force majeure occurring within 15 days from the date of force majeure, and it shall be accompanied by force majeure. The documents of the relevant authorities in the place of occurrence may be exempted from liability in case of force majeure. However, all parties shall endeavor to minimize the damage that may be caused by force majeure. If one party does not take the initiative to cooperate with the other to avoid possible losses caused by force majeure and allow the losses to expand, the negligence party should still bear the liability for compensation.
Article 15 Modification and Alteration of the Contract 1. Where a change in the quantity of a single work involves an increase in the amount of the project price of more than 50,000 (including this item), the two parties must sign a supplementary contract. The supplementary contract must be signed by the authorized representatives of both parties to the contract. Stamping this contract is effective. Otherwise, the relevant change data shall not be used as the basis for the final settlement of the parties.
2. Any amendments or changes made to this contract and its attachments shall be based on equal consultations between both parties and shall not take effect until after both parties sign a supplementary contract. Supplementary contract and this contract have the same legal effect. When the relevant clauses of this contract conflict with the provisions of the supplementary contract, the supplementary contract shall prevail.
Article 16 Dispute Settlement This contractual dispute shall be submitted to the people’s court that has jurisdiction over the location of the project. This agreement shall not be altered or withdrawn in any form.
Article 17 Data Validity, Service, Period, and Confidentiality I. Any written or electronic information related to this contract is not signed by the representative or attorney of this method, or is not affixed to a party. The seals in the contract (when using other seals, shall be confirmed in writing by both parties in advance) shall be null and void.
2. Any original written information relating to this contract shall be held by both parties. The contents of the original written material are inconsistent, and the inconsistent part is invalid.
3. Where there is written information relating to this contract and delivered to one party, the other party must issue a copy of the receipt in one copy, and the receipt shall be executed in duplicate.
4. Any written information or electronic information related to this document shall pass through the party's domicile, place of business, legal representative, authorized agent, telephone, fax, e-mail (hereinafter referred to as the contact information) as stated in this contract. Served on it (written materials may be electronically delivered to the other party in the form of scanned documents, etc.).
5. Where the sender expressly responds to the request for written information or electronic information relating to this contract and delivered to the other party, the receiving party shall reply within 10 working days after receiving the written information or electronic information. If the reply is not answered or the reply is overdue, it shall be deemed that the method of receipt has been implied. The acknowledgement or promise of the sender's written or electronic information is acknowledged. However, the contents of these written materials or electronic information relate to unit price and increase. If the issuer issues an exemption, subcontract, subcontract, or jurisdiction matter, this agreement does not apply.
6. The period stipulated in this contract is "day" and "workday", "day" is the calendar day, and "workday" is the calendar day minus the period of Saturday, Sunday and statutory holidays. The "days" and "workdays" that begin during the period are not counted in the period. The last day of the period is a holiday, and the first day after the holiday is the date when the period expires. The period does not include transit time. Written and electronic information issued before the expiry date are not expired.
Article 18 Supplementary Articles of the Contract 1. This contract shall become effective after being signed by authorized representatives of both parties and stamped with their respective legal person seals or contractual special seals. The contents of handwriting, alteration, addition, and copying of this contract are invalid except for the signature of the authorized representative and the time of signing.
2. There are only one copy of this contract, and Party A shall have one executive member and Party B shall hold one copy and shall have equal validity.
3. For matters not covered in this contract, both parties can negotiate and sign a supplementary agreement to resolve the matter.
4. If the contract is required to be filed according to the provisions of the administrative department in which the project is located, it shall be handled by Party B in accordance with the regulations, with the assistance of Party A.
Article 20 Annex I of the Contract, Architectural Drawings, Decoration Effect Picture in the Clubhouse (Annex 1)
Second, interior decoration construction drawings (Annex 2)
Third, the material equipment configuration table (Annex 3)
Fourth, quotation configuration list (Annex 4)
Fifth, the quality of housing construction project warranty (Annex 5)
Sixth, on the design changes, on-site visa approach (Annex 6)
Seventh, the Independent Commission Against Corruption (Annex VII)
8. A copy of the business license of an enterprise legal person that has passed the annual inspection, a copy of the organization code certificate, a copy of the qualification certificate, the legal representative and the entrusted agent, and the professional technical qualification certificate of the project manager and a copy of the resident identity card (each of which shall be stamped with the seal of Party B ).
Party A: Yuyao** Real Estate Development Co., Ltd. Party B: Authorized representative of Shanghai**** Engineering Co., Ltd.: Authorized representative:
Attachment: Interior Decoration Construction Drawing (Available separately)
Attachment: Material Equipment Configuration Table
**Renovation material equipment configuration table
Serial number Sub-item Item Name Brand Description Part 1 Floor 1 (excluding sand table, water view, reception desk)
1 French beige marble/deep brown mosaic lobby
2 antique floor tiles 1
3 Antique solid wood flooring 1 Yangmingshan Mudu on the straight pavilion and VIP negotiation area
4 French beige marble/deep brown mosaic seating area
5 Tiled Roman Supermarket
6 Carpet 1 Overhead Ground, Carpet Multifunction Hall 2nd and 2nd Floor
1 Carpet 2 Overhead Ground, Carpet Conference Room 1, Meeting Room 2, Open Office Area
2 Antique floor tiles 2 Hase Valley hall, walkways, reception
3 Antique solid wood floor 1 Yangmingshan wooden mallet straight on the manager's room three, a layer of the top
1 Wood structure top 1 wood base layer, plywood plus veneer finish, water paint lobby
2 Wood structure and gypsum board shape top 1 Wood base layer, solid wood carved beam head, plywood plus veneer finish, latex paint gypsum board top multifunctional hall
3 Wood structure top 2 wood base, carbonized board finish, plywood plus veneer finish, clear water paint VIP room
4 Wood Structure Top 3 Wood Base Layer, Solid Carved Beam Head, Plywood and Veneer Finish, Clear Water Paint Lounge
5 wood structure top 4 wood base layer, wood veneer, Qingshui Restaurant
6 Wood structure and gypsum board top 2 Wood base, veneer finish, waterproof gypsum board top, waterproof latex paint bathroom
7 Wood structure and gypsum board top 3 plywood with veneer finish, curved shape plasterboard top, latex paint aisle
8 Sound Control Room and Storage Room Plasterboard Lafagate Plasterboard Finishing, Latex Paint Sound Control Room Storage Room Kitchen Supermarket
9 locker custom finished cabinet door locker
10 waterproof latex paint CLOVERDALE sound control room storage room kitchen supermarket
11 paint Xin A four, second floor top
1 Plasterboard plasterboard veneer, latex paint open office area
2 Wood structure top 5 wood base layer, plywood plus veneer finish, water lacquer manager room
3 Wood structure and gypsum board top 4 gypsum board finish, latex paint conference room
4 wood structure top 6 wood base layer, splint with veneer finish, clear water paint vestibule
5 Wood structure and gypsum board top 5 Wood base layer, veneer finish, light steel keel gypsum board top, latex paint bathroom
6 Plasterboard plasterboard veneer, latex paint financial room
7 wooden structure top 8 wood base layer, curved shape plasterboard top, latex paint aisle
8 paint Xin A five, a layer of wall
1 Wall paint imitation stone paint lobby
2 wooden sill wood base, plywood plus veneer finish, water paint lobby
3 marble round window sets lobby arc window cover lobby
4 Background wall modeling wood base, veneer finish, plaster lines, imitation stone paint (excluding decorative painting) Lobby
5 wallpaper wallpaper lounge, VIP room
6 marble door lobby
7 latex paint wall CLOVERDALE storage room, sound control room, supermarket
8 Wall Paint Faux Stone Paint Toilet, Aisle, Lobby Wall
9 locker custom finished cabinet door locker
10 Bathroom cabinets custom solid wood cabinet bathroom
11 marble countertops (light brown nets)
12 Marble Baseboard Marble Baseboard Lobby, Lounge Area
13 Wooden baseboard wooden baseboard VIP room, restaurant
14 Floor Tile Baseboard Baseboard Bathroom, Aisle
15 Paint Xinjia six or two walls
1 Latex CLOVERDALE Open Office Area
2 latex paint CLOVERDALE meeting room, financial office
3 wallpaper 1 wallpaper reception hall
4 Wallpaper 2 Wallpaper Manager Office
5 latex paint CLOVERDALE storage room and sound control room
6 Bathroom Cabinets Custom Woodworking Cabinet Bathroom
7 marble countertops (light brown nets)
8 Baseboard wooden baseboard
9 Baseboard Baseboard Baseboard Bathroom, Aisle
10 Wall Paint Toilet, Aisle, Manager Room Wall
11 French beige marble staircase
12 Staircase Handrail Solid Wood Custom Stairs
13 Wrought iron railing stairs
14 paint Xinjia seven, doors and windows
1 Wood Door and Door Sleeve Finished Solid Wood Door with Paint
2-door hardware and installation of Nocard Germany joint venture
3 Lock Norka Germany Joint Venture
4 Tempered Tempered Door Tempered Painted Glass Eight, Hydropower Project
1 Sheung Shui PPR Pilsa to the front of the table
2 Plumbing fittings Amico
3 wire and casing starting sail wire, Tomson plastic
4 Low-voltage projects include telephone lines, network cables, cable television lines, and background music systems
5 Distribution Box MERLIN GERIN Series
6 Electrical Sockets, Switches Siemens Vision Series
7 Lamps NVC, REK, Hyundai Including Spotlights, Light Strips, Downlights, Brand Names to be Determined
8 leading Kohler Sino-foreign joint venture
9 Sanitary Ware Kohler Sino-foreign joint venture nine, central air conditioning
1 Central air-conditioning system “Lennox†with fresh air system 10. Structure
1 Gypsum board GYPCO including special fireproof, waterproof wall surface, top surface
2 Insulation Cotton (R20+R10) Owens Corning U.S. Exclusive Roof Part (R20) Owens Corning Inch Standard Wall Section
1, does not include the security system, fire system professional construction projects.
2, does not include professional kitchen equipment, grease traps, gas equipment and so on.
3, Shear walls, stairs, etc. Party A shall complete the structural blank and calculate the load bearing according to the material type of the decorative surface.
4, does not contain steel fire construction. The joints of the steel structure construction and interior decoration, etc. shall be determined after Party A provides the steel structure drawings.
5, The quotation is a fixed comprehensive unit price and the price is RMB 3,500/sqm.
The interior design fee and hard-decoration 2550 yuan/square meter, the wall thermal insulation and interior wall panel 350 yuan/square meter, the central air conditioner 350 yuan/square meter, the main lamp 250 yuan/square meter.
Annex IV, List of Quotation Configurations (Available separately)
Annex V.
Housing construction quality warranty
The contractor (full name) ** Real Estate Development Co., Ltd. contractor (full name) Shanghai **** Engineering Co., Ltd. contractor, contractor under the "People's Republic of China Construction Law", "Construction Project Quality Management Regulations" and "Housing Construction Projectè´¨é‡ä¿ä¿®åŠžæ³•ã€‹ï¼Œç»å商一致,**项目综åˆæ¥¼å®¤å†…装修(工程å称)ç¾è®¢å·¥ç¨‹è´¨é‡ä¿ä¿®ä¹¦ã€‚
一ã€å·¥ç¨‹è´¨é‡ä¿ä¿®èŒƒå›´å’Œå†…容承包人在质é‡ä¿ä¿®æœŸå†…,按照有关法律ã€æ³•è§„ã€è§„ç« çš„ç®¡ç†è§„定和åŒæ–¹çº¦å®šï¼Œæ‰¿æ‹…本工程质é‡ä¿ä¿®è´£ä»»ã€‚
è´¨é‡ä¿ä¿®èŒƒå›´åŒ…括屋é¢é˜²æ°´å·¥ç¨‹ã€æœ‰é˜²æ°´è¦æ±‚çš„å«ç”Ÿé—´ã€æˆ¿é—´å’Œå¤–墙é¢çš„防渗æ¼ï¼Œä¾›çƒä¸Žä¾›å†·ç³»ç»Ÿï¼Œç”µæ°”管线ã€ç»™æŽ’水管é“ã€è®¾å¤‡å®‰è£…和装修工程,以åŠåŒæ–¹çº¦å®šçš„其他项目。具体ä¿ä¿®çš„内容,åŒæ–¹çº¦å®šå¦‚下: / 。
二ã€è´¨é‡ä¿ä¿®æœŸåŒæ–¹æ ¹æ®ã€Šå»ºè®¾å·¥ç¨‹è´¨é‡ç®¡ç†æ¡ä¾‹ã€‹åŠæœ‰å…³è§„定,约定本工程的质é‡ä¿ä¿®æœŸå¦‚下:
1ã€åœ°åŸºåŸºç¡€å·¥ç¨‹å’Œä¸»ä½“结构工程为设计文件规定的该工程åˆç†ä½¿ç”¨å¹´é™ï¼›
2ã€æœ‰é˜²æ°´è¦æ±‚çš„å«ç”Ÿé—´é˜²æ¸—æ¼ä¸ºä¼å¹´ã€‚
3ã€è£…修工程为贰年;
4ã€ç”µæ°”管线ã€ç»™æŽ’水管é“ã€è®¾å¤‡å®‰è£…工程为贰年;
5ã€ä¾›çƒä¸Žä¾›å†·ç³»ç»Ÿä¸ºè´°ä¸ªé‡‡æš–期ã€ä¾›å†·æœŸï¼›
6ã€ä½å®…å°åŒºå†…的给排水设施ã€é“è·¯ç‰é…套工程为/ å¹´ï¼›
7ã€å…¶ä»–项目ä¿ä¿®æœŸé™çº¦å®šå¦‚下: / 。
三ã€è´¨é‡ä¿ä¿®è´£ä»»
1ã€å±žäºŽä¿ä¿®èŒƒå›´ã€å†…容的项目,承包人应当在接到ä¿ä¿®é€šçŸ¥ä¹‹æ—¥èµ·48å°æ—¶å†…派人ä¿ä¿®ã€‚承包人ä¸åœ¨çº¦å®šæœŸé™å†…派人ä¿ä¿®æˆ–åŒä¸€é—®é¢˜ä¸¤æ¬¡ä¿®ç†ä¸å¥½çš„,å‘包人å¯ä»¥å§”托他人修ç†ï¼Œè´¹ç”¨ç”±æ‰¿åŒ…人(ä¿ä¿®å•ä½ï¼‰å…¨éƒ¨æ‰¿æ‹…。
2ã€å‘生紧急抢修事故的,承包人在接到事故通知åŽï¼Œåº”当在å…å°æ—¶å†…到达事故现场抢修,å¦åˆ™å‘包人å¯ä»¥å§”托他人进行抢修,费用由承包人(ä¿ä¿®å•ä½ï¼‰å…¨éƒ¨æ‰¿æ‹…。
3ã€å¯¹äºŽæ¶‰åŠç»“构安全的质é‡é—®é¢˜ï¼Œåº”当按照《房屋建ç‘工程质é‡ä¿ä¿®åŠžæ³•ã€‹çš„规定,立å³å‘当地建设行政主管部门报告,采å–安全防范措施;由原设计å•ä½æˆ–者具有相应资质ç‰çº§çš„设计å•ä½æ出ä¿ä¿®æ–¹æ¡ˆï¼Œæ‰¿åŒ…人实施ä¿ä¿®ã€‚
4ã€è´¨é‡ä¿ä¿®å®ŒæˆåŽï¼Œç”±å‘包人组织验收。
å››ã€ä¿ä¿®è´¹ç”¨
1ã€ä¿ä¿®è´¹ç”¨ç”±é€ æˆè´¨é‡ç¼ºé™·çš„责任方承担;
2ã€æ‰¿åŒ…人ä¸åŠæ—¶è¿›è¡Œç»´ä¿®æˆ–两次维修ä¸å¥½çš„,å‘包人å¦è¡Œå§”托他人维修,ä¿ä¿®å•ä½é¡»æ‰¿æ‹…全部维修费用(包括15%的管ç†è´¹ï¼‰ï¼›
3ã€å¯¹äºŽç»“æž„è´¨é‡é—®é¢˜ï¼Œæ‰¿åŒ…äººåº”æ ¹æ®å®¢æˆ·è¦æ±‚委托专业å•ä½è¿›è¡Œå®‰å…¨é‰´å®šåŠå‡ºå…·å¤„ç†æ–¹æ¡ˆï¼Œå¹¶è´Ÿè´£ç»„织实施和承担费用;
4ã€å¯¹äºŽç”±è´¨é‡é—®é¢˜é€ æˆçš„å®¢æˆ·ç´¢èµ”ï¼Œåº”æ ¹æ®å…¶å®žé™…æŸå¤±æˆ–评估价值,承包人须视情况进行相应赔å¿ï¼›
5ã€æœ¬å·¥ç¨‹çš„è´¨é‡ä¿ä¿®é‡‘ä¸ºç»“ç®—é€ ä»·çš„3%,在工程ä¿ä¿®æœŸå†…ï¼Œæ— è´¨é‡äº‹æ•…ä¸äº§ç”Ÿä¿ä¿®çš„按竣工验收åˆæ ¼ä¹‹æ—¥èµ·ï¼Œæ»¡ä¸€å¹´ä»˜æ¸…(ä¸è®¡åˆ©æ¯ï¼‰ã€‚如过程之ä¸äº§ç”Ÿç›¸åº”çš„è´¨é‡äº‹æ•…,则按维修的金é¢åœ¨å·¥ç¨‹ä¿ä¿®é‡‘ä¸æ‰£é™¤ï¼Œå¦‚费用超过工程ä¿ä¿®é‡‘é¢æ—¶ï¼Œå‘包人有æƒå‘承包人追å¿ã€‚
五ã€å…¶ä»–åŒæ–¹çº¦å®šçš„其他工程质é‡ä¿ä¿®äº‹é¡¹ï¼šåœ¨å›½å®¶è§„定的ä¿ä¿®æœŸå¤–,如承包人承建的工程出现质é‡é—®é¢˜ç³»æ‰¿åŒ…人å·å·¥å‡æ–™æˆ–使用ä¸åˆæ ¼åŽŸææ–™ã€æˆå“ã€åŠæˆå“(ä¸åŒ…括甲供æ料)引起的,å‘包人有æƒæ— é™æœŸè¿½æº¯ï¼Œæ‰¿åŒ…人承担由æ¤æ‰€é€ æˆçš„一切ç»æµŽæŸå¤±ã€‚
本工程质é‡ä¿ä¿®ä¹¦ï¼Œç”±æ–½å·¥åˆåŒå‘包人ã€æ‰¿åŒ…人åŒæ–¹åœ¨ç«£å·¥éªŒæ”¶å‰å…±åŒç¾ç½²ï¼Œä½œä¸ºæ–½å·¥åˆåŒé™„件,其有效期é™è‡³ä¿ä¿®æœŸæ»¡ã€‚
person A person B:
授æƒä»£è¡¨ï¼š 授æƒä»£è¡¨ï¼š
附件å…ã€å…³äºŽè®¾è®¡å˜æ›´ã€çŽ°åœºç¾è¯çš„办法一ã€è®¾è®¡å˜æ›´åŠçŽ°åœºç¾è¯
1ã€è®¾è®¡å˜æ›´å’ŒçŽ°åœºç¾è¯çš„原则:
1)è”ç³»å•çš„è®¡ä»·åŽŸåˆ™ï¼Œä¸¥æ ¼æŒ‰ç…§åˆåŒçº¦å®šçš„计价方å¼è®¡ç®—费用,éšè”½å·¥ç¨‹çš„现场ç¾è¯ï¼ŒåŒæ–¹åœ¨å·¥ç¨‹éšè”½ä¹‹å‰æ ¸å®šï¼›
2)è”ç³»å•å˜æ›´åšåˆ°æœ‰æ®å¯ä¾ï¼Œæ¶‰åŠå·¥ç¨‹é‡å˜æ›´æˆ–结构å˜åŠ¨çš„附修改图;
2ã€çŽ°åœºç¾è¯åŠè®¾è®¡å˜æ›´æ“作程åº
1)现场ç¾è¯ç”±æ‰¿åŒ…人æ出,å‘包人工程部专业工程师å—ç†ã€‚è´Ÿè´£å˜æ›´æƒ…况的陈述,对现场ç¾è¯çš„陈述è¦æ±‚客观ã€å‡†ç¡®ï¼Œè¦æ±‚éšè”½ç¾è¯ä»¥å›¾çº¸ä¸ºä¾æ®ï¼Œè¡¨æ˜Žè¢«éšè”½çš„部ä½ã€è´¨é‡å®Œæˆæƒ…况,如果被éšè”½éƒ¨ä½çš„工程é‡åœ¨å›¾çº¸ä¸Šä¸ç¡®å®šï¼Œè¿˜è¦æ±‚è¡¨æ˜Žå‡ ä½•å°ºå¯¸ï¼Œå¹¶é™„ç®€å›¾ã€‚èƒ½å¤Ÿä½œä¸ºå®Œæ•´è®¡ç®—å˜æ›´è´¹ç”¨çš„ä¾æ®ã€‚
2)å‘包人工程部专业工程师负责工程é‡è®¡é‡ï¼ŒçŽ°åœºç›‘ç†å¯¹ç¾è¯çš„执行进行åˆå®¡ã€‚
3)å‘包人工程部ç»ç†å®¡æ ¸å·¥ç¨‹å˜æ›´çš„å¿…è¦æ€§å’Œç»æµŽæ€§ã€‚
4)å‘包人æˆæœ¬æŽ§åˆ¶éƒ¨æ ¸å®šå·¥ç¨‹é‡å’Œå˜æ›´è´¹ç”¨ã€‚
5)å‘包人相关部门按照å‘包人内部è”ç³»å•å®¡æ‰¹æµç¨‹å’Œæƒé™è¿›è¡Œå®¡æ ¸ã€‚
6)技术è”ç³»å•å’ŒçŽ°åœºç¾è¯çš„ç¾å¤æ„è§ï¼Œç”±å‘åŒ…äººé¡¹ç›®ä¸“ä¸šå·¥ç¨‹å¸ˆæ ¹æ®å®¡æ‰¹æ„è§å¡«å†™ï¼Œç”±å‘包人项目公å¸æ€»ç»ç†å’Œå·¥ç¨‹ç®¡ç†ä¸å¿ƒæ€»ç›‘å…±åŒç¾å—ï¼Œç›–ç« ç”Ÿæ•ˆã€‚
3 ã€çŽ°åœºç¾è¯å•å’Œè®¾è®¡å˜æ›´å•çš„预算编审原则
1)一å•ä¸€ç®—原则:为了便于对施工过程ä¸çš„æˆæœ¬ç®¡ç†å’ŒæŽ§åˆ¶ï¼Œæé«˜ç»“ç®—çš„å®¡æ ¸æ•ˆçŽ‡ï¼ŒçŽ°åœºç¾è¯å•å’Œè®¾è®¡å˜æ›´å•åŽŸåˆ™ä¸Šä¸€å•ä¸€ç®—ã€‚å¯¹äºŽæ— æ³•ç®—å‡†çš„çŽ°åœºç¾è¯å•å’Œè®¾è®¡å˜æ›´å•ï¼Œåº”先估价,待竣工结算时一并予以调整。
2)é‡ä»·åˆ†ç¦»åŽŸåˆ™ï¼šå‘包人现场工程部åªç¡®è®¤å‘生的工程é‡ï¼Œè®¡ä»·ç”±å‘包人æˆæœ¬æŽ§åˆ¶éƒ¨è´Ÿè´£ã€‚
3)时间é™åˆ¶åŽŸåˆ™ï¼šå¯¹çŽ°åœºç¾è¯çš„办ç†ä¸¥æ ¼æŒ‰åˆåŒä¸çº¦å®šçš„时间é™åˆ¶ï¼Œä¸¥ç¦è¿‡åŽè¡¥åŠžçš„åšæ³•ã€‚
4)æƒåˆ©é™åˆ¶åŽŸåˆ™ï¼šå¯¹çŽ°åœºç¾è¯ç®¡ç†å®žè¡Œä¸¥æ ¼çš„æƒé™çš„规定,ä¸åœ¨å§”托授æƒé™èŒƒå›´å†…çš„ç¾å—ä¸€å¾‹æ— æ•ˆã€‚
4〠现场ç¾è¯åŠè®¾è®¡å˜æ›´çš„有效性:
现场ç¾è¯åŠè®¾è®¡å˜æ›´ï¼Œéœ€ç»å‘包人åŒç¾ï¼Œç›‘ç†ã€æ‰¿åŒ…人三方共åŒç¾å—ï¼ŒåŠ ç›–å‘包人项目è”ç³»å•ä¸“ç”¨ç« åŽç”Ÿæ•ˆã€‚ç¼ºå°‘ä»»ä½•ä¸€æ–¹éƒ½å±žäºŽæ— æ•ˆç¾è¯ï¼Œä¸èƒ½ä½œä¸ºç»“ç®—ä¾æ®ã€‚
5ã€è®¾è®¡å˜æ›´åŠçŽ°åœºç¾è¯çš„价款计算时,应当执行以下三项原则。
1)åˆåŒä¸å·²æœ‰é€‚用于å˜æ›´å·¥ç¨‹çš„ä»·æ ¼ï¼Œåº”æŒ‰å·²æœ‰ä»·æ ¼è®¡ç®—å˜æ›´è´¹ç”¨ã€‚
2)åˆåŒä¸åªæœ‰ç±»ä¼¼äºŽå˜æ›´å·¥ç¨‹çš„ä»·æ ¼ï¼Œå¯ä»¥å‚ç…§æ¤ç±»ä»·æ ¼è®¡ç®—å˜æ›´è´¹ç”¨ã€‚
3)åˆåŒä¸æ²¡æœ‰é€‚用或类似于å˜æ›´å·¥ç¨‹çš„ä»·æ ¼,按本åˆåŒæœ‰å…³çº¦å®šå±¥è¡Œã€‚
附件七廉政公约为了ä¿è¯ç”²ä¹™åŒæ–¹çš„å…±åŒåˆ©ç›Šï¼Œæœç»ä¸€åˆ‡å•†ä¸šè´¿èµ‚,让åŒæ–¹åœ¨â€œè¯šä¿¡è´Ÿè´£â€çš„原则下,å‘展æ£å¸¸çš„商业关系,长期åˆä½œï¼Œæˆä¸ºçœŸæ£ä¿¡èµ–çš„åˆä½œä¼™ä¼´ï¼Œç”²ä¹™åŒæ–¹åœ¨ç¾è®¢ä¸»åˆåŒçš„åŒæ—¶ï¼Œç¾è®¢æœ¬å…¬çº¦ï¼Œä½œä¸ºåˆåŒé™„件。
一ã€æœ¬å…¬çº¦è§„定的商业贿赂是指在甲乙åŒæ–¹çš„商业活动ä¸ï¼Œä¹™æ–¹ç»™äºˆç”²æ–¹èŒå‘˜ä»»ä½•å½¢å¼çš„礼å“ã€çŽ°é‡‘ã€æœ‰ä»·è¯åˆ¸ã€æ”¯ä»˜å‡è¯æˆ–其他ç»æµŽåˆ©ç›Šã€‚
二ã€ç”²ã€ä¹™åŒæ–¹éƒ½åŒæ„åšå†³æ‹’ç»ç´¢è´¿ã€è¡Œè´¿åŠå…¶ä»–ä¸æ£å½“之交易行为。
三ã€ä¹™æ–¹ä¸€æ—¦æ”¶åˆ°ç”²æ–¹å‘˜å·¥ã€é›‡å‘˜ã€ä»£ç†äººæˆ–å…³è”å…¬å¸ä»¥ä»»ä½•å½¢å¼å¯¹å…¶æ出索è¦ç¤¼å“ã€çŽ°é‡‘ã€æœ‰ä»·è¯åˆ¸ã€æ”¯ä»˜å‡è¯æˆ–其他ç»æµŽåˆ©ç›Šçš„è¦æ±‚,å¯ç«‹å³å‘甲方举报,电è¯ï¼š****ï¼Œä¼ çœŸå·ç :******;甲方一ç»æŸ¥å®žï¼Œå¿…将严厉处ç†ï¼Œç”²æ–¹ä¸ºä¸¾æŠ¥äººä¿å¯†ã€‚
å››ã€åœ¨ç”²ä¹™åŒæ–¹çš„商业活动ä¸ï¼Œä¹™æ–¹è¿å本公约,给予甲方èŒå‘˜ã€é›‡å‘˜ã€ä»£ç†äººæˆ–å…³è”å…¬å¸ä»»ä½•å½¢å¼çš„礼å“ã€çŽ°é‡‘ã€æœ‰ä»·è¯åˆ¸ã€æ”¯ä»˜å‡è¯æˆ–其他ç»æµŽåˆ©ç›Šçš„,甲方一ç»æŸ¥å®žï¼Œç”²æ–¹å¯ä»¥å•æ–¹é¢è§£é™¤åˆåŒï¼Œåœæ¢æ”¯ä»˜æ‰€æœ‰åº”支付乙方的款项,并å‘乙方索赔贿赂é¢åå€çš„金é¢ä½œä¸ºè¿çº¦é‡‘或在甲方应支付乙方的款项ä¸æ‰£é™¤ã€‚对于乙方è¿åæœ¬å…¬çº¦çš„è¡Œä¸ºç»™ç”²æ–¹é€ æˆçš„一切æŸå¤±ç”±ä¹™æ–¹è´Ÿè´£èµ”å¿ã€‚
五ã€ä¹™æ–¹æœ‰ä¸Šè¿°å•†ä¸šè´¿èµ‚行为的,甲方一ç»æŸ¥å®žï¼Œç”²æ–¹æ‰€å±žçš„**房产集团旗下的å„å…³è”å…¬å¸ä»ŠåŽä¸å†ä¸Žä¹™æ–¹å‘生任何ç»æµŽå…³ç³»ï¼Œå³ä¸å†ä¸Žä¹™æ–¹ä»Žäº‹ä»»ä½•å•†ä¸šç»è¥æ´»åŠ¨ã€‚
å…ã€æœ¬å…¬çº¦è‡ªç”²ä¹™åŒæ–¹ç¾ç½²ä¹‹æ—¥èµ·ç”Ÿæ•ˆï¼Œä¸Žä¸»åˆåŒå…·æœ‰åŒç‰æ³•å¾‹æ•ˆåŠ›ã€‚
person A person B:
授æƒä»£è¡¨ï¼š 授æƒä»£è¡¨ï¼š
节1.01 更多装修知识请æµè§ˆï¼š
节1.02 è¥¿å®‰è£…ä¿®è¯¾å ‚ä¸»ç«™ï¼šhttp://
节1.03 è¥¿å®‰è£…ä¿®è¯¾å ‚è§†é¢‘ç«™:http://
节1.04 è¥¿å®‰è£…ä¿®è¯¾å ‚äº’åŠ¨ç¤¾åŒºï¼šhttp://029zx.topzj.com
玄关装修儿童房装修漆乳胶漆大ç†çŸ³é—¨ä»·æ ¼è£…饰公å¸åŽ¨æˆ¿é—¨è£…修效果图厨房设备厨房装修设计效果图室内装修设计效果图室内装修效果图仿å¤è£…修效果图外墙装修效果图装饰装修工程预算大厅装修效果图房屋装修效果图过é“装修效果图楼梯装修效果图储è—室装修效果图隔æ–装修效果图装修隔æ–åŠžå…¬å®¤è£…ä¿®æ•ˆæžœå›¾çŽ»ç’ƒç –æ©±æŸœé—¨åŽ¨æˆ¿éš”æ–门玻璃隔æ–门仿å¤åœ°æ¿å·¥è‰ºçŽ»ç’ƒé›•èŠ±åœ°æ¿ç –玻璃柜门隔æ–柜雕花玻璃柜门厨房柜门隔æ–门大ç†çŸ³æ©±æŸœçŽ»ç’ƒé—¨ä»¿å¤ç –厨房玻璃推拉门å«ç”Ÿé—´é—¨
NANSHAN Ceiling Tool Drive Pins are specifically fabricated to meet the exacting requirements of toughness and durability that enable them to penetrate dense concrete and structural quality steel.
We maintain only the highest standards in the materials, production techniques and quality control measures used to manufacture our fasteners, assuring consistent, optimum quality in every fastener.
The Propellant Power-Pins are specially designed for NANSHAN CEILING FASTENING TOOLS.
Applications
- Mechanical & electrical, bridge, fire control equipment and other jobsites
- Wood joist ceiling, wooden floor
- Integrated ceiling
-
Wire tie, cables and pipes fastening
Ceiling Tool Drive Pins
Ceiling Tool Drive Pins,Ceiling Fastener Pin,Roof Fastening Bracket,Ceiling Drive Pin
Sichuan Nanshan Powder Actuated Fastening System Co., Ltd. , http://www.nanshanpat.com