During the renovation, many people will put a lot of energy into the price of decoration materials because of the lack of decoration experience, and ignore the order of home decoration . The wrong order of home decoration can easily cause people to lose half their efforts. What is the correct order of family decoration ? Let's take a look with Xiaobian!
What is the order of home renovation?
1. Early design
Before the renovation, it is necessary to specify the tiling area, wallpaper area, floor area and tiling area of ​​the house, and measure the wall size of the furniture placed in the decoration design.
2. Demolition and renovation of the main body
The dismantling of the main body mainly includes the demolition of walls, the construction of walls, the removal of wall coverings, the removal of heat and the replacement of plastic windows, etc. The garbage generated after dismantling shall be cleared out of the room in time to ensure the cleanliness of the room and be ready for future construction.
3. Transform waterways and circuits
Before the hydropower reform, the cabinet designer was required to make measurements and determine the exact positions of the lamps, basins, bathtubs, washing machines, and switches, so as to formulate a hydropower reform program and design the position of the power supply and the interface. The air-conditioning and power supply should be placed on the wall of the bedside as much as possible to avoid direct blows to people.
4. Wallpaper
After the putty and wall paint are brushed, the paint union will apply nitro-lacquer to the place where the wallpaper is to be applied. After the nitro-lacquer on the wall is completely dry, you can choose your favorite wallpaper for paving.
5. Install the socket panel
This project only needs a half day to complete the installation. However, during the installation process, it is necessary to pay attention to the use of a socket with a switch function. The electrical appliance can be directly controlled by a switch, and it is not necessary to repeatedly plug in or pull out the power.
6. Install the cabinet
When installing cabinets, you can buy range hoods, sinks and cookers in advance and install them together with cabinets, saving time and effort.
7. Install the finished door
The finished door is installed earlier than the floor because installing the finished door not only has a lot of tedious steps, but also requires a lot of tools. If the finished door is installed after the floor is installed, it is easy to cause the floor to bump.
8. Install hardware accessories
Drying racks, curtain rods, lighting fixtures, sanitary ware, and sanitary ware are all required to be completed before the floor is installed, otherwise it is very easy to damage the floor.
9. Install the floor
When installing the floor, try not to allow the workers to cut the floor tiles in the room, otherwise it will be very easy to damage the already laid floor tiles.
10. Late decoration
When the framework of the entire house is clear, we can also add some late accessories such as curtains and decorations according to the decoration style and space design.
Xiao Bian concludes: On the order of family decoration, Xiao Bian introduced it here today, and hopes to help everyone. If you still want to understand or consult more related issues, welcome to pay attention to this site!