Nowadays, people’s clothing, food, housing and living standards are very different from those of the past. At the same time, the decoration technology of the living environment has also been greatly improved. For example , the process of interior decoration ceilings has been simplified a lot. For everyone to analyze the detailed steps of the ceiling installation.
1, determine the ceiling height
In general, the accurate measurement of ceiling height is the first step in the process of decorating the ceiling. The specific operation method is to prepare a tape measure first, then mark the high level line of the house, and confirm the elevation by means of vertical measurement, and then use the elastic wire to pop the keel from the position of the top plate. After completing this step, do not Forgot to use this method to determine the elevation level of the ceiling area in the wall position.
2, install the main keel boom
After doing a good job of elevating floors and walls, the next step in the process of fitting the ceiling is to install the main keel boom. If the position of the ceiling elevation line and the main keel has been clearly defined, the elevation of the lower boom can be performed, and the implementation is also very simple. One of the boltless rods is fixed to the main keel by expansion bolts. It is just below the floor under the hanging distance. One thing to note here is that professional and qualified booms are generally required to be made of 8mm flat steel or 6m steel, so everyone must remember to understand the material specifications of the boom when buying.
3, complete the nut fitting
This step seems simple, but it is a key part of the process of decorating the ceiling. Because if you do not install a nut, it is likely to have a security risk. During the installation, the hanging materials should be accurately placed on the main keel, and then they should be threaded into the corresponding bolts according to the specific sub-line position to ensure that the nuts are tightened, and successively with the main keel and other The connection materials are connected to each other, and then the cable is pulled again to check whether the elevation is accurate. If it is otherwise adjusted, the main keel and related materials are fixed after adjustment.
4, install the buckle board
After the main keel and each part of the nut are configured, the gusset installation process in the process of fitting the ceiling can be carried out. The most important thing to remind everyone here is that if you want a compact and seamless effect, be sure to insert the triangle hole in the small hole at the fold side of the gusset plate with no hesitation. After a good, a slight pressure can be.
5, install the electrical module
The process of decorating the ceiling is basically over here, and it is only necessary to purchase electrical modules according to the type that you like.
Xiao Bian concludes: The progress of science and technology, along with the improvement of the level of decoration technology, based on people's different types of living style requirements, the installation of the ceiling and the steps have become more abundant, so I hope the process of decoration ceiling ceiling Can help a friend in need.
Pneumatic Actuator,Pneumatic Valve Actuator,Rotary Pneumatic Valve Actuator,Double Acting Pneumatic Actuator
WENZHOU FOREVER CLASSIC TECHNOLOGY CO.,LTD , https://www.fosicvalve.com