Electronic patrol system construction plan

[ Huaqiang Security Network News ]
Electronic patrol system construction plan I. System introduction
The inspection system consists of Aegis H-5B induction patrol stick, communication line, patrol point antenna and software. The patrol point is an induction tube that imports laser-encoded 8-bit hexadecimal coded information. The number of each sensor tube is globally unique. Place the patrol point sensor tubes with different codes on the equipment or line being inspected, and set the code and corresponding placement location in the computer. The inspectors wear a patrol stick and use the patrol stick to approach the antenna 5-10CM during the inspection. When the card is successfully read, the light vibration prompts, and the reading time and location are stored in the patrol stick. The manager inserts the patrol stick into the communication line and connects with the computer, and reads the patrol bar inspection data into the computer through the application software in the computer. Archived. At any time, management personnel can analyze, process, count, and produce reports, providing managers with a scientific and accurate assessment basis.
Induction patrol stick
1, induction patrol
※Automatic proximity card reader RFID 125KHz
※ Tips: Light vibration prompt
※Communication: USB communication
※Use battery: 3.6V rechargeable lithium battery, low power consumption 0.001W, charge more than 200,000 times
※Induction distance: >3cm
※Material: Aviation aluminum alloy
2, patrol point
The integrated circuit chip is sealed in the outer casing, waterproof and corrosion resistant, and durable, and can be used in various harsh environments. Each sensor number is not re-coded and no power is required.
Number of reading cards: >350,000 times
Lifespan: One-piece > 20 years;
Card type > 10 years
Ambient temperature: -40°C∽+85°C
Size: diameter 8.5CM, thickness: 1CM
Weight: 50g
3, communication cable
Dedicated USB data cable, completely sealed to ensure smooth data transmission
4, battery and charger
lithium battery
The battery that comes with the product is not saturated, so it needs to be filled before
use. If the battery voltage is not enough, there will be a red flashing or no light after power-on. At this time, the battery needs to be charged, otherwise the battery will be overcharged.
Electricity causes damage to the battery.
Executive standard: GB T18287-2000
Electronic patrol system construction plan II, equipment installation
1, patrol point installation:
1) First determine the mounting point (not less than 1.5M above the ground), and then take the impact drill to the mounting point (6mm diameter) hole.
2) Record the installation location corresponding to each patrol point (all installation points should correspond to the computer patrol point settings).
3) First determine the installation point (not less than 1.5M above the ground), then insert the rubber plug into the installation point punch (2 holes) with the impact drill.
4) Open the cover and secure the plate with self-tapping screws.
5) Reinstall the cover and box.
2. Standard installation plan:
1. According to the length of the patrol route, the layout plan of the patrol point: in principle, one floor per floor, one line per line of sight, one hundred meters each, and patrol points must be buried in important or complex locations.
2, the configuration of the inspection machine: In principle, each patrol route is divided into three classes of patrols, one patrol machine per line per line, the setting can be determined according to the actual situation.
3. Install the software correctly, and set the actual location corresponding to the eight-digit number of each buried wall patrol point on the patrol route in the software. (Please be sure not to set the error, otherwise the future statistics will be Will go wrong).