The decoration package is a kind of decoration mode denominated in square meters, that is, the decoration main materials include wall tiles, floor tiles, floors, cabinets, sanitary ware, door and door covers, wall paint, ceilings, etc. , materials and labor include interior decoration styles featuring clear prices, complete packages, and seamlessly connected services. But is the decoration package good? How much is the decoration package quote ? What are the traps in the renovation package need to be prepared? Here's a look for everyone.
Good decoration package
How many hidden dangers outside the package?
The contract was signed, and materials came in. However, during construction, many services were found not to be part of the package. Without these services, decoration could not be carried out. For example, door covers, window covers, and dumb mouths could be used by consumers. Money, the final result is beyond the project budget.
Cause of the problem: The key point of this type of problem is in the contract. Some home improvement companies deliberately set up some vague concepts in the contract, or concealed or underreported the amount of work during the design of the renovation project. In addition, some home improvement companies and consumers have deliberately planted substandard "foreshadowing" when signing contracts. For example, "If the raw materials in the decoration are out of stock, Party B can temporarily replace the same type of material."
Countermeasures: Before signing a contract, consumers must understand in detail all the procedures involved in the renovation and the content of the contract. The brand model of the material should be clearly marked. If there is a change in the project, it must be added to the contract to do additional work. No matter how big the thing is, it is well documented.
Does it save time and effort
As consumers are concerned, their commitment to the initial selection of package-style renovations is that they can be very relieved that by signing the contract, they can select all types of main materials needed for the package, but afterwards, many times I do not worry. For example, according to the stipulations of the contract, the material selected by the consumer needs to be checked and accepted at the construction site. If the other party notifies him and he does not arrive at the appointed time, the consumer is liable for breach of contract.
Cause of the problem: Some decoration companies have hurriedly launched packages and have not dredged away the key links such as the supply of main materials. As a result, the supply of goods has not been timely or even the supply has become disconnected. At the same time, some home improvement companies did not complete the material distribution work, materials did not enter the site according to the agreed time, repeated delays, consumers repeatedly rushed to the scene, exhausted.
Countermeasures: Experts believe that this is mainly the choice of home improvement companies. There are many companies that currently carry out package-style renovations, but a large part of them are only rushed to operate. Therefore, if you plan to choose a decoration package, do not be impressed by the simple low price. It is best to go to the previous customer to ask for advice and then make a decision.
What are the decoration package traps?
A: Decoration package main material traps:
The variety of main materials offered is single and of low grade. Individual decoration companies provide consumers with a single brand of main material. When consumers pay the deposit and then determine the specific materials, they find that there is little room for choice. If the consumer proposes to change materials, additional money will be required. There are also many companies that use their main material to standardize certain large brand products or to exaggerate the role of the main materials, such as ceramic tile. There are many famous brands on the market, but because the manufacturers update quickly, so many defective products or eliminated The product flowed into the market for the package.
Two: decoration package project quality traps:
The package decoration mode is the same as the traditional home decoration mode. It is also composed of two parts: the basic engineering and the main material. Therefore, in order to save the cost of basic decoration, some companies either reduce the quality of the substrate or arrange the construction of a relatively poor technical team. To reduce the cost of basic engineering. Therefore, when signing a contract, you must understand the quality of the substrate that the company provides to consumers. As for the level of mechanics, you must understand the quality of the company and whether there are some technical means to control the quality of the project.
Three: decoration package price trap trap:
Many people tend to put prices on the most pre-requisite for choosing a company, because if you look at it as "cheap", is it really cheap? Actually not! The sky won't fall, even if you drop the pie It won't hurt you. Is nothing more than a price war played by some companies. As the saying goes: Buying is never considered fine. Therefore, some companies will cut into the low price package, and later in the high-end additions to the decoration package trap.
Four: decoration package give traps:
Free upgrades, price increase upgrades, and free gifts try to use a lot of activities to attract customers, and customers often get only a small part or originally belong to the customer's part, just under the marketing means of the business was blindfolded. There are also so-called gift items that are only giving away products. Some decoration companies do not specify the price in detail. They only use certain brands of products, but they do not specify the models and specifications.
Five: decoration package free design trap:
In the increasingly fiercely competitive decoration market, many home improvement companies still play "free design" promotions in the decoration package trap. However, individual home improvement companies first reported a lower renovation package, which was later supplemented by a free design commitment to persuade consumers to pay a deposit. After the consumer pays the deposit, the decoration designer's decoration budget based on the on-site measurement results is much higher than the consumer-selected package. At this point, once the consumer repents, he cannot return his deposit. Or the old saying goes: Wool is on the sheep. There can't be free stuff, and it's free. Other places have to count it.
Renovation Package Quotation
1. Laying floor tiles, the main material is floor tiles, and the auxiliary materials are cement, yellow sand, water and glue. The price of the auxiliary material is 10/m2, where the algorithm for the main material per square is 1/(A*B), and then multiply by The price of bricks, (a lot of decoration companies have a phenomenon, refers to 11.3 block counted 12, which is unreasonable) loss is 5.
2. The production of baseboards should be baseboard (9 PCT board 3 plywood) baseboard lines, paint, labor prices.
3. The latex paint on the top of the wall should have the basic price for artificial primer primer treatment.
4. Plasterboard ceiling, according to the projected area billing: auxiliary materials artificial prices.
5. The door should be installed, including the door and door attachments (such as hinges, hinges, door locks, door suction) paint labor
6. The production of various cabinets and partitions and decorative walls should be based on the installation of paints and hand-painted hardware components.
7. Hydroelectric installation: The cost is divided into three parts: the auxiliary material line pipe, wires, etc.; the main material switch, socket, lamps, sanitary ware, etc.; labor costs, different standards are not the same. Hydropower installations also include kitchen bathroom equipment installations. Most of the decoration companies pre-collect fees according to the house construction area, and settle after the completion of the project.
Editor's summary: The information on the renovation package is good, decoration package quotes for everyone to introduce here, I hope this article helps everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.
Decoration quote
Kubota excavators and compact track loaders have gained a worldwide reputation for quality and reliability in skid steer and excavator machinery.
Accordingly, JUHENG are pleased to match these qualities of Kubota's with a wide range of genuine, OEM and quality replacement parts for Kubota compact track loaders and mini excavators. These include Final Drive, swing drive, hydraulic pump and slew ring for all Kubota skid steer and excavator models.
Parts for Kubota Skid Steer and Excavator Machines
Investigate below the stock availability for your Kubota excavator part. If a unit is available and you order before 3pm we despatch worldwide the same day.
To find out more about our range and our repair and reconditioning services, click on the part type you require under 'Brand Parts We Stock'
If you require a Kubota hydraulic pump, click our Kubota Main Pump finder to investigate options and request a quote.
Hydraulic Piston Pump, Duplex Pump, Short-Stroke Pump, Noise/Vibration Reduction, High Self-Priming Ability, Rotational Stability, High Efficiency, High Pressure, Compact Size, Reduction of Overall Length.
Kubota hydraulic pumps provide low-noise, high efficiency and high reliability with various controls for construction machinery.
We export GENUINE PUMP, OEM PUMP, AFTERMARKET PUMP. We are specialized in OEM PUMP & AFTERMARKET PUMP. We export 95 NATIONS. Please contact us If you need STABLE SUPPLIER.
Kubota Hydraulic Main Pump,Kubota Main Hydraulic Pump,Kubota Hydraulic Pump,Kubota Hydraulic Pump Spare Parts,Kubota Hydraulic Main Pump Assembly,Kubota Main Pump,Kubota Pump,Kubota Hydraulic Parts,Kubota Excavator Parts
Jining Juheng Hydraulic Machinery Co., Ltd. , https://www.sdjuhengmachine.com