Bathroom renovation is an important part of home decoration, but many new homeowners face a problem. After the renovation, the tiles will start to fall off. This completely disrupts the good mood of our decoration, so what are the precautions for decorating the tiles? Xiaobian gives you a brief introduction to the installation steps trilogy. As long as the normal paving method is used, it can reduce the possibility of decoration. Various problems that arise!
First, before the bathroom wall tile
1. The specifications of the bathroom wall tiles must be coordinated with the paving area.
The specifications of the bathroom wall tiles should not be too large. The oversized wall tiles will give people an uncoordinated feeling, while the small-sized wall tiles will have a better decorative effect, which can increase the sense of space of the bathroom to a certain extent. The commonly used bathroom wall tiles are mainly 300*400mm, 300*300mm, 250*330mm, 200*300, 250*330, 300*450, 300*600.
2, before the bathroom wall tile paving must be done before the brickwork plan must be done before the paving plan, try not to appear less than one third of the wall of the narrow column. It is necessary to process and cut, and it is better to leave more than two-thirds of the tiles after cutting.
3. Understand the direction of hydropower wiring
Be sure to remember the direction of the wall water pipes before paving. It is best to keep the traces of the circuit and waterway. Also, it is necessary to conduct a closed-water and closed-circuit experiment to avoid water leakage and leakage.
Second, when the bathroom wall tiles are laid
1. Understand the proportion of cement slurry
The cement used for pasting the bathroom wall brick is 425 cement. The mixing ratio of cement sand should not be greater than 1:3. If the cement content is too heavy, the wall will be cracked due to the high expansion coefficient of the cement, reducing the use of wall tiles. life.
2, must be wet before the paving
If you choose to use glazed wall tiles and cement mortar as a binder, you must fully wet the wall tiles in the paving. Generally, the time of soaking should not be long, only takes 30 minutes.
3, the paving should be left
Paving toilet wall tiles must be slits regardless of whether they belong to seamless bricks. It is recommended to be no less than 1mm, ordinary wall tiles should be 1.5-2mm, and antique brick gaps can be properly widened.
Third, after the bathroom wall tiles are laid
1, fill the wall tile gap
It is generally filled with a colorful caulk, usually used for the seam wall. It is characterized by strong color adhesion, pressure and wear resistance, no alkalization, no shrinkage, no powdering, not only changing the wall. The gap between the bricks is easy to fall off and the adhesion is not strong. It also makes the color of the gap and the matching of the tiles seem to be unified and coordinated.
2, wall brick hollow drum inspection
After the paving is completed, it is necessary to carry out the inspection of the empty brick wall. How to appear the empty drum phenomenon? We can use the glass suction cup to suck all the bricks and re-paving. We must find the wool on the wall cement layer and then re-do the base layer. And then lay the wall tiles.