Bathroom decoration regret summary (below)

9,


In order to catch up with the progress, the workers did not even do the necessary waterproof construction in the bathroom, and they immediately began to install furniture.


Chen Gong reminded: The construction of bathroom should generally include the construction of waterproofing this procedure. The general order is to level the entire wall and ground first, then do waterproof construction, and then apply the tiles to the walls. The waterproofing of the walls should be over 1.8 meters.

10、


The water pipes installed in the toilet were accidentally broken by the workers. The broken pipes were so ugly that they were not exposed.


Chen Gong reminded: The principle of arrangement of water and electricity pipes in general bathrooms is to take the top and walk. Laying pipes on the ground is not only difficult to avoid as shown in the figure, but also has an impact on the laying of floor tiles.

11.


Newly purchased bathtubs did not have any protective measures. After installation, they were exposed to the construction site of the renovation and did not become stained.


Chen Gong reminded: For all kinds of equipment in advanced fields, it should also take appropriate protective measures to avoid unnecessary damage.

12,


The folding door installed in the bathroom is the way the owner looks at the store, and then makes the decorating company to make it, but because the level is not enough, leaving a big seam.


Chen Gong reminded: similar to bathroom doors and shower doors, such facilities are best to ask professional manufacturers to customize, or buy their products directly. This guarantees quality.

13,


After installing the stainless steel toilet paper rack, it was found that the distance between the toilet and the toilet was so close that it was inconvenient to use.


Chen Gong reminded: When shopping for small objects, we must achieve a good measure of size. We must focus on buying products. Do not think where to buy, and don't let things be bought inconveniently.

14,


Just installed the ceiling of the bathroom, actually found that there are drops of water, all hidden projects did not make trouble.


Chen Gong reminded: Before installing the ceiling in the bathroom, we must wait until the acceptance of the concealed project can be started. Otherwise, we must revisit the problem after we have discovered the problem.

15,


The overhead wiring of the bathroom is actually a mess. It is not a leak in the ceiling that needs repair. It is still difficult to find this phenomenon.


Chen Gong reminded: In the ceiling of the combustible structure, fire retardant pipe should be added and a power switch should be installed outside the ceiling to cut off the power when necessary. The joints of the wires should be inside the terminal box.

16,


The tile of this brand originally looked good, so although the brand is unknown, it was bought in order to save the silver. It didn't take long for the shop to do so.


Chen Gong reminded: To ensure quality, or can not be petty, buy a well-known brand products more at ease.

Zhongyu Sanitary luminaire brand bathroom toilet switch furniture stainless steel bathroom tile bathroom door bathroom door size bathroom size bathroom ceiling bathroom waterproof bathroom floor tile bathroom leak

Workstation Sink

A Workstation sink is a sink with a mechanism built in to the front and back sides of the bowl to allow accessories to sit on the step or ledge, affording the user to prepare meals on the sink instead of on the countertop. The intent behind the design is to speed up the process of food preparation and clean-up.

Workstation Sink,Farmhouse Workstation Sink,Work Station Kitchen Sink,Workstation Farmhouse Sink

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroup.com

Posted on